New Firepool Boulevard in depth
At the beginning of April the new Firepool Boulevard was opened providing a traffic free route for pedestrians and cyclists from the railway station to the centre of Taunton. The boulevard cost £5m and was paid for by the government’s future high street fund. Infrastructure has been put in place to encourage developers to the area. Hopefully that will come to fruition soon as it is a bit desolate at the moment.
Future high street fund
This is just one of the locations where money from the future high street fund has been ploughed into along with the Coal Orchard Redevelopment and the new crossing over Upper High Street to Vivary Park. Part of money from this fund was to create an ‘uninterrupted’ pedestrian and cycle route from the railway station to Vivary Park so the boulevard provides one of the missing links to allow that to happen.
It will be good to see the new bridge over the River Tone from Morrisons supermarket to the Coal Orchard area delivered soon. It is still a major stopping point as you need to dismount and wheel your cycle across the bridge.
TACC’s contribution to the consultation
During the consultation period for the Firepool scheme (in 2022) TACC encouraged Somerset Council to allow cycling on the boulevard as this provides a great active travel route that is traffic free. The images show that the new boulevard has plenty of room for pedestrians and cyclists alike.
Cycling from the railway station into town
The boulevard does provide a great traffic-free route for people coming from the railway station. However, for those coming from North Taunton, Station Road is still the preferred route taking you pass some great local shops. Station Road is one of our cycling ‘Hotspots’ identified in the 2016 survey.
Closer to Trenchard Way the cycle route is diverted along the access road but provides plenty of room for many cyclists. Those in wheelchairs, mobility scooters or with push chairs can take the path that winds up to join the pedestrian route up the stairs.
At the top of the access road on Trenchard Way, there is a bit of both good and bad infrastructure. It is well marked out to cross the access road but joining the cycle path on Trenchard Way is a bit of mess. Furthermore, there is little signage to direct cyclists too and from the railway station.



Widening footbridge between Morrisons and Taunton Brewhouse
Good news for cyclists (and pedestrians) with Somerset Council’s planning committee recently approving plans to remove the existing footbridge between Morrison’s supermarket and the Brewhouse theatre and replace it with a wider bridge. This is all part of the plan to create a new active travel route that is traffic free from the station to Vivary Park, via Firepool and Coal Orchard.
The existing bridge on the National Cycle Network Route 3 necessitates that the cyclist dismounts and walk their bike across, especially as this is a very busy pedestrian route. This can cause conflict between cyclists and pedestrians. With the widening of the bridge to 4 metres it will now comply with the Department of Transport’s LTN 1/20 guidelines for how much room is needed to allow pedestrians and cyclists to use the route at the same time. The ramp that already exists on the north bank will be replaced with steps and a new ramp will be constructed alongside the river.

Station to Vivary Park active travel link
The active travel link between the railway station to Vivary Park is taking shape with the improvement at Upper High Street with the new pedestrian/bicycle crossing. The High Street has been converted from a pedestrian only zone to a shared space between cyclists and pedestrians and St James Street provides a traffic free route to cycle through.
We look forward to the continuing development of the route through the Firepool regeneration site where work has started next to the new Digital Innovation Centre.
Coal Orchard
A cycle route via Coal Orchard is finally recognised on the ground, thanks to the former Somerset West and Taunton Council. The original planning application for Coal Orchard didn’t include a specific cycle link. This new cycle link forms part of the railway station to Vivary Park proposed cycle route.
TACC made a statement at the planning committee in 2017, which resulted in discussions with Council officers and their consultants and the plans were changed. Timely representation can work (sometimes).

