Cycle parking provision

TACC is a strong advocate for high-quality, secure, and convenient cycle parking.
People would cycle more if better, more secure, parking were available. It is often the most important factor in choosing to cycle to workplaces and stations. Dedicated, secure, well-overlooked, or even sheltered and covered parking reduces the fear of theft and protects bike components.

Parking should be close to final destinations (e.g., building entrances), easily accessible, and designed to fit the specific needs of the location (e.g., high-volume vs. short-stay). An additional advantage is that proper provision reduces cluttered and unsafe pavements.

Installing bike racks is an essential investment for businesses, attracting customers and employees. It is a critical, often neglected, component of urban planning that influences modal shift for daily commutes.

Cover of Chapter 11 from LTN-20 about cycle parking
DfT Cycle Infrastructure Design (LTN 1/20) contains a large chapter enphasizing the need for cycle parking as an integral part of cycle infrastructure design.
Crowded cycle parking at Taunton station
16/02/2026

Taunton station cycle parking

In 2026 the total number of cycle parking spaces on platform 1 and 5 at Taunton station is 82. Outside, near the main entrance of the station, are 10 sheffield racks. These spaces were not created out of the blue, there’s history.

In 2017 TACC met Mark Youngman, integrated transport manager for GWR, to talk about installing more cycle racks at the station. He told us they had guaranteed funding for 150 additional cycle spaces, that had to be spent by December 2018. They also had a community-based fund that could be used to fund access improvements to the station, although the budget had been allocated up until 2019.

In January 2019 Great Western Railway installed 30 new cycle spaces at Taunton station. We were told that the rest of the in total 150 new cycle spaces were part of the major scheme for the station. Unfortunately, the 150 new cycle spaces have not materialised.

11/02/2024

Cycle hubs – an ambitious plan that came to nothing

A priority for Somerset Council was the development of two secure cycle hubs with lockable access in the town centre as payable facilities. The first cycle hub has been constructed in the Crescent car park. A second hub was proposed at St James Street but not realised. We were surprised that this was the Council’s big priority given the gaps in the cycle network, for example the road surface at The Parade roundabout and Station Road.

However, Somerset Council told us that the funding for these projects had been re-allocated and no further work will be done. The Crescent scheme will be half finished. Much of Somerset Council and TACC time has been wasted.

A small number of additional cycle racks have been installed in the town centre, for example outside of former Poundland in North Street.

Crescent car park with the cycle hub parking
11/02/2023

Good cycle parking Aldi – Chip Lane

TACC campaigned strongly for improved cycle parking and access as the original plan was extremely poor. Fortunately, a high quality covered secure parking facility together with a link to Chip Lane Bridge has been provided. We congratulate Aldi on providing such a good facility for cyclists.

Bicycle shelter at Aldi Chip Lane
10/02/2018

No parking at Lidl – Roman Road

We called on Lidl to install Sheffield racks close to the entrance to their store, so that cyclist have somewhere to secure their bikes. This Lidl shop came bottom of our league table of supermarkets in Taunton cycle parking at supermarkets, because there is no cycle parking provision.

We contacted Lidl twice to ask for discussions and visited the store to highlight the issue, but they did not want to engage with us.
There is ample car parking. Cyclists also spend money at the store, so why shouldn’t they also have some convenient provision?